Stormwater Preparations
Published 6:18 pm Tuesday, November 6, 2018
New manholes are higher above grade than those being replaced beside North Boundary Canal, and new sewer pipes have been buried (background), all in preparation for installation of a much larger stormwater culvert beneath North Road Street in Columbia. Original forecast was that the street will reopen by Nov. 14.