North Boundary Canal rennovation

Published 4:39 pm Monday, November 12, 2018

The new culvert was placed into North Boundary Canal in Columbia on Nov. 8. It is designed to reduce flooding in the vicinity. The handrail will be beside a first-ever sidewalk over the canal. North Road Street could be closed until Dec. 1 while curb and gutter, sidewalks and street surfaces are put in place, officials say.