North Boundary Canal rennovation
Published 4:39 pm Monday, November 12, 2018
- (R. McClees photo)
The new culvert was placed into North Boundary Canal in Columbia on Nov. 8. It is designed to reduce flooding in the vicinity. The handrail will be beside a first-ever sidewalk over the canal. North Road Street could be closed until Dec. 1 while curb and gutter, sidewalks and street surfaces are put in place, officials say.